[EXTERNAL] [microgrids] Haiku and next session


Shuli Goodman
 

Next time you start. I loved these…a funny exercise, but I believe quite insightful.

Enjoy your weekends.


Shuli



l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++



On Apr 8, 2021, at 3:59 PM, kotaro.jinushi@... wrote:

Here is mine.
 
Spirits resides in the detailed
Core of power system exits in minimum unit
Let’s connect them
 
Another one but this is a slogan or definition.
Microgrid is an symbol 
of bottom up approach for the democratization of electric network
 
Regards,
Kotaro
 
From: Lorenzo Kristov <lkristov91@...> 
Sent: Friday, April 9, 2021 7:52 AM
To: Shuli Goodman <sgoodman@...>
Cc: James Kempf <kempf42@...>; Tod Morita <todmaplemorita@...>; microgrids@... Calendar <microgrids@...>; Bruce Nordman <bnordman@...>; Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; Deva Seetharam <deva.seetharam@...>; Daniel Lazaro <dlazaro@...>; James Gula <jlgula@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session
 
Haiku attached. - Lorenzo  
 
 

Lorenzo Kristov, Ph.D.
Electric system policy, structure, market design
PO Box 927, Davis, California 95617-0927, USA
Mobile: +1 916 802-7059
Email: LKristov91@...

 
 
On Apr 8, 2021, at 3:45 PM, Shuli Goodman <sgoodman@...> wrote:
 
These are great! Not all 5 x 7 x5…but hey, we are inventing the future! I love it.
 
Each electron counts
Energy and power freed
Nature wastes nothing
 
Talk with you all soon.

 

Shuli

 

 
l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++
 
 
 
 
 
 
 




On Apr 8, 2021, at 3:29 PM, James Kempf <kempf42@...> wrote:
 
I buy an inverter,
I buy solar,
I buy a battery,
They all talk and work together nicely.
 
           jak
 
On Thu, Apr 8, 2021 at 3:10 PM Tod Morita <todmaplemorita@...> wrote:
Dear all, 
 
My Haiky:
 
Haiku for 2050 
Power grid that accommodates each other
It will be completed if you have individual inertia
Individual buffering rather than total inertial force
By Tadashi


2021/04/09 7:03James Gula <jlgula@...>のメール:
 
Another Haiku:
 
Power comes and goes
Power joins per droop command
The pattern repeats
 
Jim

 



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:
 
A Haiku:
 
Power starts local
Goes where it should easy as pie
Price makes world go round
 
On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. Its a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)

 

On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 

 
 

 
-- 
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943
 
James Gula
2018 Galaxy DR
Newport Beach, CA 92660
949-375-2153
 
 
 
 
 


kotaro.jinushi@...
 

Here is mine.

 

Spirits resides in the detailed

Core of power system exits in minimum unit

Let’s connect them

 

Another one but this is a slogan or definition.

Microgrid is an symbol

of bottom up approach for the democratization of electric network

 

Regards,

Kotaro

 

From: Lorenzo Kristov <lkristov91@...>
Sent: Friday, April 9, 2021 7:52 AM
To: Shuli Goodman <sgoodman@...>
Cc: James Kempf <kempf42@...>; Tod Morita <todmaplemorita@...>; microgrids@... Calendar <microgrids@...>; Bruce Nordman <bnordman@...>; Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; Deva Seetharam <deva.seetharam@...>; Daniel Lazaro <dlazaro@...>; James Gula <jlgula@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Haiku attached. - Lorenzo 

 

 

Lorenzo Kristov, Ph.D.
Electric system policy, structure, market design
PO Box 927, Davis, California 95617-0927, USA
Mobile: +1 916 802-7059
Email: LKristov91@...

 

 

On Apr 8, 2021, at 3:45 PM, Shuli Goodman <sgoodman@...> wrote:

 

These are great! Not all 5 x 7 x5…but hey, we are inventing the future! I love it.

 

Each electron counts

Energy and power freed

Nature wastes nothing

 

Talk with you all soon.

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Apr 8, 2021, at 3:29 PM, James Kempf <kempf42@...> wrote:

 

I buy an inverter,

I buy solar,

I buy a battery,

They all talk and work together nicely.

 

           jak

 

On Thu, Apr 8, 2021 at 3:10 PM Tod Morita <todmaplemorita@...> wrote:

Dear all,

 

My Haiky:

 

Haiku for 2050 

Power grid that accommodates each other

It will be completed if you have individual inertia

Individual buffering rather than total inertial force

By Tadashi



2021/04/09 7:03James Gula <jlgula@...>のメール:

 

Another Haiku:

 

Power comes and goes
Power joins per droop command
The pattern repeats

 

Jim

 



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

 

A Haiku:

 

Power starts local

Goes where it should easy as pie

Price makes world go round

 

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. Its a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)

 

On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 

 

 


 

-- 

Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...

510-486-7089; m: 510-501-7943

 

James Gula

2018 Galaxy DR

Newport Beach, CA 92660

949-375-2153

 

 

 

 

 

 


Lorenzo Kristov
 

Haiku attached. - Lorenzo 


Lorenzo Kristov, Ph.D.
Electric system policy, structure, market design
PO Box 927, Davis, California 95617-0927, USA
Mobile: +1 916 802-7059
Email: LKristov91@...



On Apr 8, 2021, at 3:45 PM, Shuli Goodman <sgoodman@...> wrote:

These are great! Not all 5 x 7 x5…but hey, we are inventing the future! I love it.

Each electron counts
Energy and power freed
Nature wastes nothing

Talk with you all soon.


Shuli



l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++



On Apr 8, 2021, at 3:29 PM, James Kempf <kempf42@...> wrote:

I buy an inverter,
I buy solar,
I buy a battery,
They all talk and work together nicely.

           jak

On Thu, Apr 8, 2021 at 3:10 PM Tod Morita <todmaplemorita@...> wrote:
Dear all,

My Haiky:

Haiku for 2050 
Power grid that accommodates each other
It will be completed if you have individual inertia
Individual buffering rather than total inertial force
By Tadashi

2021/04/09 7:03、James Gula <jlgula@...>のメール:

Another Haiku:

Power comes and goes
Power joins per droop command
The pattern repeats

Jim



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

A Haiku:

Power starts local
Goes where it should easy as pie
Price makes world go round

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...> 
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 





-- 
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943

James Gula
2018 Galaxy DR
Newport Beach, CA 92660
949-375-2153







Shuli Goodman
 

These are great! Not all 5 x 7 x5…but hey, we are inventing the future! I love it.

Each electron counts
Energy and power freed
Nature wastes nothing

Talk with you all soon.


Shuli



l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++



On Apr 8, 2021, at 3:29 PM, James Kempf <kempf42@...> wrote:

I buy an inverter,
I buy solar,
I buy a battery,
They all talk and work together nicely.

           jak

On Thu, Apr 8, 2021 at 3:10 PM Tod Morita <todmaplemorita@...> wrote:
Dear all,

My Haiky:

Haiku for 2050 
Power grid that accommodates each other
It will be completed if you have individual inertia
Individual buffering rather than total inertial force
By Tadashi

2021/04/09 7:03、James Gula <jlgula@...>のメール:

Another Haiku:

Power comes and goes
Power joins per droop command
The pattern repeats

Jim



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

A Haiku:

Power starts local
Goes where it should easy as pie
Price makes world go round

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...> 
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 





-- 
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943

James Gula
2018 Galaxy DR
Newport Beach, CA 92660
949-375-2153






Daisuke Kawamoto
 

Store clean energy

Flexible grid by stationary and mobile battery

Exchange energy by individual

 

Daisuke Kawamoto

 

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Friday, April 9, 2021 7:30 AM
To: Tod Morita <todmaplemorita@...>
Cc: microgrids@... Calendar <microgrids@...>; Bruce Nordman <bnordman@...>; Kotaro Jinushi <kotaro.jinushi@...>; Shuli Goodman <sgoodman@...>; Deva Seetharam <deva.seetharam@...>; Daniel Lazaro <dlazaro@...>; James Gula <jlgula@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I buy an inverter,

I buy solar,

I buy a battery,

They all talk and work together nicely.

 

           jak

 

On Thu, Apr 8, 2021 at 3:10 PM Tod Morita <todmaplemorita@...> wrote:

Dear all,

 

My Haiky:

 

Haiku for 2050 

Power grid that accommodates each other

It will be completed if you have individual inertia

Individual buffering rather than total inertial force

By Tadashi



2021/04/09 7:03James Gula <jlgula@...>のメール:

 

Another Haiku:

 

Power comes and goes
Power joins per droop command
The pattern repeats

 

Jim

 



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

 

A Haiku:

 

Power starts local

Goes where it should easy as pie

Price makes world go round

 

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. Its a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)

 

On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 

 

 


 

-- 

Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...

510-486-7089; m: 510-501-7943

 

James Gula

2018 Galaxy DR

Newport Beach, CA 92660

949-375-2153

 

 

 

 


James Kempf <kempf42@...>
 

I buy an inverter,
I buy solar,
I buy a battery,
They all talk and work together nicely.

           jak


On Thu, Apr 8, 2021 at 3:10 PM Tod Morita <todmaplemorita@...> wrote:
Dear all,

My Haiky:

Haiku for 2050 
Power grid that accommodates each other
It will be completed if you have individual inertia
Individual buffering rather than total inertial force
By Tadashi

2021/04/09 7:03、James Gula <jlgula@...>のメール:

Another Haiku:

Power comes and goes
Power joins per droop command
The pattern repeats

Jim



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

A Haiku:

Power starts local
Goes where it should easy as pie
Price makes world go round

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...> 
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 





-- 
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943

James Gula
2018 Galaxy DR
Newport Beach, CA 92660
949-375-2153





Tod Morita
 

Dear all,

My Haiky:

Haiku for 2050 
Power grid that accommodates each other
It will be completed if you have individual inertia
Individual buffering rather than total inertial force
By Tadashi

2021/04/09 7:03、James Gula <jlgula@...>のメール:

Another Haiku:

Power comes and goes
Power joins per droop command
The pattern repeats

Jim



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

A Haiku:

Power starts local
Goes where it should easy as pie
Price makes world go round

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...> 
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

-- 

best regards,

Deva P. Seetharam


 

-- 

best regards,

Deva P. Seetharam

 





-- 
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943

James Gula
2018 Galaxy DR
Newport Beach, CA 92660
949-375-2153





James Gula
 

Another Haiku:

Power comes and goes
Power joins per droop command
The pattern repeats

Jim



On Apr 8, 2021, at 2:58 PM, Bruce Nordman <bnordman@...> wrote:

A Haiku:

Power starts local
Goes where it should easy as pie
Price makes world go round

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...>
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

--

best regards,

Deva P. Seetharam


 

--

best regards,

Deva P. Seetharam

 





--
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943

James Gula
2018 Galaxy DR
Newport Beach, CA 92660
949-375-2153




Bruce Nordman
 

A Haiku:

Power starts local
Goes where it should easy as pie
Price makes world go round

On Wed, Mar 31, 2021 at 4:38 PM <kotaro.jinushi@...> wrote:

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...>
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

--

best regards,

Deva P. Seetharam


 

--

best regards,

Deva P. Seetharam

 



--
Bruce Nordman
Lawrence Berkeley National Laboratory
nordman.lbl.gov
BNordman@...
510-486-7089; m: 510-501-7943


kotaro.jinushi@...
 

Hello Deva,

 

This is Kotaro Jinushi from Sony Computer Science Laboratories and I am leading the Hyphae project.

The TSC is held on Friday morning at 7 am JST, which is 3:30 am in Indian time. We are open to have a separate discussion to you. Please contact me freely for further discussion.

 

With best regards,

Kotaro

 

From: Shuli Goodman <sgoodman@...>
Sent: Wednesday, March 31, 2021 3:13 AM
To: deva seetharam <deva.seetharam@...>
Cc: Jinushi, Kotaro (Sony CSL) <Kotaro.Jinushi@...>; James Kempf <kempf42@...>; Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 

There is no need to hold back. Jump in! 

 

Thanks,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

 

i suppose we are not able to find a time slot that works for all of us.

i will let you folks continue as per your convenience. 

i don't want to make it difficult for you folks to meet.

 

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:

3 pm PT is 3:30 AM IST. that won't work for me.

i understand the earth is round. i was told world is becoming more flat now. 

 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:

Kotaro-san, you are very generous to consider that. 

 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

 

I will revert the schedule. Apologies for the confusion. 

 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

 

With regrets. 

 

 

l. shuli rose goodman

+1.415.722.9688

(sent from my tin can)



On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 

On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


 

--

best regards,

Deva P. Seetharam


 

--

best regards,

Deva P. Seetharam

 


Shuli Goodman
 

Deva, as a next step and to facilitate the group integrating you - I would encourage you to: 1) sign up for the mailing list; 2) introduce yourself to the group; 3) listen to the recordings; 4) reach out to the Hyphae TSC; 5) get on their mailing list; 6) get the code and literally start to work! All of this and MORE can be found on the LF Energy website and wiki. 

We need to divide and conquer - meaning that you and the Sony team find a time and you just start to onboard. We can find another time. 
There is no need to hold back. Jump in! 

Thanks,


Shuli



l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++



On Mar 29, 2021, at 10:32 PM, deva seetharam <deva.seetharam@...> wrote:

i suppose we are not able to find a time slot that works for all of us.
i will let you folks continue as per your convenience. 
i don't want to make it difficult for you folks to meet.

On Tue, Mar 30, 2021 at 11:00 AM deva seetharam <deva.seetharam@...> wrote:
3 pm PT is 3:30 AM IST. that won't work for me.
i understand the earth is round. i was told world is becoming more flat now. 

On Tue, Mar 30, 2021 at 9:40 AM Shuli Goodman <sgoodman@...> wrote:
Kotaro-san, you are very generous to consider that. 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

I will revert the schedule. Apologies for the confusion. 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

With regrets. 


l. shuli rose goodman
+1.415.722.9688
(sent from my tin can)

On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 



--
best regards,
Deva P. Seetharam


--
best regards,
Deva P. Seetharam


Shuli Goodman
 

Kotaro-san, you are very generous to consider that. 

We did have a conversation about the later time, but clearly moving it was not as settled or fully agreed to as I understood. For several reasons then, I think we should keep this as-is - 3p Th PT, 7a JST. 

I will revert the schedule. Apologies for the confusion. 

Deva, I am sorry the round earth is so complicated with time zones. It’s a disappointment. 

With regrets. 


l. shuli rose goodman
+1.415.722.9688
sgoodman@...
(sent from my tin can)

On Mar 29, 2021, at 7:58 PM, kotaro.jinushi@... wrote:



Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


kotaro.jinushi@...
 

Dear all,

 

11 pm is bit challenging to me but if this is the only slot, I will follow.

 

With best regards,

Kotaro

 

From: microgrids@... <microgrids@...> On Behalf Of James Kempf
Sent: Tuesday, March 30, 2021 4:29 AM
To: Shuli Goodman <sgoodman@...>
Cc: Daniel Lazaro <dlazaro@...>; microgrids@... Calendar <microgrids@...>; deva seetharam <deva.seetharam@...>
Subject: Re: [EXTERNAL] [microgrids] Haiku and next session

 

I would prefer something earlier as well.

 

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

 

      jak

 

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

 

Others?

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 





On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

 

5pm PST will be a challenging time for me to join. 

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 

 

 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.

 


James Kempf <kempf42@...>
 

I would prefer something earlier as well.

My timezone calculator shows that 7 AM Pacific is 7:30 PM in Mumbai and 11 PM in Tokyo. Or an hour earlier would work for me as well. 

Alternatively, we could rotate the meeting time to distribute the inconvenience.

      jak

On Mon, Mar 29, 2021, 11:46 AM Shuli Goodman <sgoodman@...> wrote:
I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

Others?


Shuli



l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++



On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

5pm PST will be a challenging time for me to join. 
 
Daniel Lázaro
Senior Technical Program Manager
 +1 (510) 875-3698
AVEVA \ Performance Intelligence
 
 
From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session
 
Caution: This email came from outside the company.

Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.
 
This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 
 
Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.
 
1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 
2) Contribute a "picture" of what you see.
 
I am attaching Lorenzo's example.
 
 
Thanks again,
 
Shuli

 

 
l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++
 
 
 
 
 
 
 


 

OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.


Shuli Goodman
 

I get it. This is a problem for me as well. In general, by the time 5p comes around, I am less than coherent. However, as a group we decided to try it.

Others?


Shuli



l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++



On Mar 29, 2021, at 10:24 AM, Daniel Lazaro <dlazaro@...> wrote:

5pm PST will be a challenging time for me to join. 
 
Daniel Lázaro
Senior Technical Program Manager
 +1 (510) 875-3698
AVEVA \ Performance Intelligence
 
 
From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session
 
Caution: This email came from outside the company.

Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.
 
This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 
 
Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.
 
1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 
2) Contribute a "picture" of what you see.
 
I am attaching Lorenzo's example.
 
 
Thanks again,
 
Shuli

 

 
l. shuli rose goodman phd.
executive director, LF Energy
a Linux Foundation project
twitter: @LFE_Foundation
linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231
+++++++++++++++++++++++++++
+++++++++++++++++++++++++++
Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 
+++++++++++++++++++++++++++
 
 
 
 
 
 
 


 

OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.


Daniel Lazaro
 

5pm PST will be a challenging time for me to join.

 

Daniel Lázaro
Senior Technical Program Manager

 +1 (510) 875-3698

AVEVA \ Performance Intelligence

Twitter | YouTube | LinkedIn | Facebook | aveva.com

 

 

From: <microgrids@...> on behalf of Shuli Goodman <sgoodman@...>
Date: Monday, March 29, 2021 at 9:58 AM
To: "microgrids@..." <microgrids@...>
Cc: deva seetharam <deva.seetharam@...>
Subject: [EXTERNAL] [microgrids] Haiku and next session

 

Caution: This email came from outside the company.


Hi all - Starting April 8th we are shifting our meetings to 5p PT to accommodate both Japan and very early morning India. Deva has indicated a strong desire to participate.

 

This is the transcript and audio from our March 25th meeting. We had a time zone mishap with US already shifted to daylight savings time. 

 

Next session we are doing a little exercise to share our year 2050 vision. The goal is to see if we can get more aligned with what we imagine.

 

1) Please write a haiku (5 syllables, 7 syllables, 5 syllables. 

2) Contribute a "picture" of what you see.

 

I am attaching Lorenzo's example.

 

 

Thanks again,

 

Shuli

 

 

l. shuli rose goodman phd.

executive director, LF Energy
a Linux Foundation project

twitter: @LFE_Foundation

linkedin.com/in/shuligoodman
c: +1.415.722.9688
v: +1.707.874.3231

+++++++++++++++++++++++++++

+++++++++++++++++++++++++++

Join me at the LF Energy Spring Summit on April 14 - Register Today! Check out the great line-up here. 

+++++++++++++++++++++++++++

 

 

 

 

 

 

 

 

 

 



 


OSIsoft is now part of AVEVA. AVEVA Group plc is registered in England at High Cross, Madingley Road, Cambridge, England CB3 0HB. Number 2937296.