On Feb 3, 2022, at 11:22 AM, Mirz, Markus <markus.mirz@...> wrote:

Hello,
 
I had a look at the API that electricitymap is using to pull real-time ENTSOE data.
 
As you can see here:
The data is structured according to iec62325.351:tc57wg16.
 
IEC 62325 is based on CIM (IEC 61970) and developed by the same technical committee.
 
The CIM IEC core model describes everything that you need to run a power flow.
That means that (among many other things) it lets you define nodes and branches of the network as well as their characteristics (e.g. active and reactive power in/output and line impedance).
 
It seems to me that bringing these things together might not be that difficult after all 😊
 