CIM CGMES and ENTSOE real-time electricity data


Mirz, Markus <markus.mirz@...>
 

Hello,

 

I had a look at the API that electricitymap is using to pull real-time ENTSOE data.

 

As you can see here:

https://transparency.entsoe.eu/content/static_content/Static%20content/web%20api/Guide.html

The data is structured according to iec62325.351:tc57wg16.

 

IEC 62325 is based on CIM (IEC 61970) and developed by the same technical committee.

 

The CIM IEC core model describes everything that you need to run a power flow.

That means that (among many other things) it lets you define nodes and branches of the network as well as their characteristics (e.g. active and reactive power in/output and line impedance).

 

It seems to me that bringing these things together might not be that difficult after all 😊

 

Cheers

Markus

 

Join {cdsc-power-system-data-wg@lists.lfenergy.org to automatically receive all group messages.